Product

Craftsmanship products serve diverse customer needs

Product

Product Overview

h beam

Section Steel

Hot Products

GradeYield Strength ReH/MPaTensile Strength Rm/MPaElongation After Fracture A/%Impact Test
≤16mm>16≤40mm>3≤100mm>3≤40mmTemperature/°CImpact Absorbed Energy KV2/J
S355J2≥355≥345470~630 L₀=5.65√S₀ ​​≥22-20 ≥27 
S355J2+AR
S355J2+N
S355K2≥355≥345470~630 L₀=5.65√S₀ ≥22-20≥40
S355N≥355≥345470~630 L₀=5.65√S₀ ≥22-20≥40
S355NL≥355 ≥345470~630    L₀​=5.65√S₀ ≥22-40≥31
-50≥27
S355M≥355≥345470~630 L₀​=5.65√S₀ ≥22-20≥40
S355ML≥355≥345470~630  L₀​=5.65√S₀ ≥22-40≥31
-50≥27
GradeYield Strength ReH/MPaTensile Strength Rm/MPaTensile Specimen Gauge Length /mmElongation /%Yield Ratio
GR50≥345≥450200≥18
50≥21
A992345-450≥450200≥18≤0.85
50≥21
Havey H Beam Production Line

Characteristic: The web thickness is around 71.9mm

Applications:

Heavy Industrial Buildings — Main framework columns and beams in heavy-duty structures such as steel mills, power plants, and petrochemical facilities

Long-Span Bridges — Main girders and bridge deck longitudinal beams of large steel bridges

Super High-Rise Buildings — Mega columns at lower levels and transfer floor components in high-rise steel structures

Offshore Engineering — Jacket structures and trestle bridges for offshore platforms

Stadiums and Large-Span Public Buildings — Main roof girders, bearings, and critical load-bearing components

Key Components in Seismic Design — Special thickened-section columns in Special Moment Frames (SMF)

Heavy Equipment Support Structures — Foundations for large mechanical equipment, generator/turbine pedestals

Aerospace Launch Facilities — Launch towers, Vertical Assembly Buildings (VAB), and other heavy-duty structures subjected to immense impact and vibration

Maximum flange width of 500mm (H500×500×25×25); maximum section height of 1172mm (W44 series); maximum flange thickness of 140mm (UC356×406×1299)

Non-standard hot-rolled H-section steel: “derived sections” optimized from standard sections, and “custom-designed sections” developed from new designs.

custom-made example

With the same set of universal rolling rolls, the produced hot-rolled H-section steel has a fixed web height (Hw) and a fixed half-flange overhang width (bf). “Derived sections” are those that can be produced by adjusting the roll gap with the same set of rolls used for a standard section. Developed from existing standard sections, “derived sections” offer advantages over “custom-designed sections” in terms of development cost and lead time. The optimized section height, width, and thickness dimensions shall all fall within the limit range. In principle, the ratio of flange thickness to web thickness shall be controlled within 1.0–2.0.

Our Fabrication

Our company is equipped with over 50 sets of advanced domestic steel structure processing equipment, including a 20,000W laser cutting machine, integrated H-beam and box-type assembly machines, integrated submerged arc welding machines for section and box steel, a Model 60 straightening machine, a Model 1622 pass-through shot blasting and rust removal machine, CNC machine tools, automatic bevel welding machines, and horizontal suction spray painting booths.

01
Raw Material Cutting
02
Perforating
03
Cut-to-Length (CTL)
04
Roll Forming
05
Welding
06
Shot Blasting Pre-treatment
07
Slitting
08
Galvanizing
CONTACT US

Projects

National Stadium (Bird's Nest)
National Stadium (Bird’s Nest)
Shanghai Expo Centre
Shanghai World Expo Center
beijing daxing international airport
Beijing Daxing International Airport
Habtoor-Grand-Residences
Habtoor Crystal Residences Tower
Image Gallery 3 803x1024
Al Maktoum International Airport
yamal LNG project
Yamal LNG Project
peru La Haya project
Shougang Peru Mining 5 Million Tons/Year Concentrator Plant Steel Structure Procurement Project

Location: Marcona, Ica Region, Peru Project Capacity: 5 million tons/year concentrator plant
Project Function: Iron Ore Concentration Plant / Mining Processing Facility Main Processes:
Steel Structure Detailing
Raw Material Inspection
Cutting and Fabrication
Welding
Surface Treatment
Packing and Shipment
Contractor:

China MCC Tiangong Group Urban Construction Branch
(MCC Tiangong Urban Construction Company)

Ceer-Manufacturing
Saudi CEER Automotive Project Phase II Steel Structure Work
red sea project
Saudi Arabia Red Sea Public Utilities Infrastructure Project
Inner Mongolia Xinte 100,000 Tons/Year High-Purity Polysilicon Project Phase I Section III
Inner Mongolia Baotou 100,000 Tons/Year Polysilicon Project
xinjiang
Xinjiang Xinte Energy Zhundong 100,000 Tons/Year High-End Electronic-Grade Polysilicon Project

Location:
Zhundong Economic and Technological Development Zone, Changji Hui Autonomous Prefecture, Xinjiang, China
Project Function:
High-End Electronic-Grade Polysilicon Production Facility / New Energy Material Plant
Production Capacity:
100,000 tons/year (Phase I). Total Planned Capacity:
200,000 tons/year (Phase I & Phase II)
Investment:
Approximately RMB 17.6 billion
Project Owner:
Xinte Energy Co., Ltd. / Xinjiang Xinte Silicon Materials Co., Ltd.

Hong Kong-Zhuhai-Macao Bridge
Hong Kong–Zhuhai–Macao Bridge (HZMB)
Hangzhou Bay Cross-Sea Bridge Project
Hangzhou Bay Cross-Sea Bridge Project
Qinghai–Tibet Railway and Sichuan–Tibet Railway
Qinghai–Tibet Railway and Sichuan–Tibet Railway Project
Mengxi–Beijing–Tianjin–Hebei HVDC Transmission Project
Mengxi–Beijing–Tianjin–Hebei UHVDC Power Transmission Project
Baihetan–Zhejiang ±800 kV UHVDC Transmission Project
Baihetan–Zhejiang ±800 kV UHVDC Transmission Project
Longdong–Shandong ±800 kV UHVDC Transmission Project
Longdong–Shandong ±800 kV UHVDC Transmission Project

Location: Qingyang, Gansu Province, to Dongping, Tai’an, Shandong Province, China, passing through Gansu, Shaanxi, Shanxi, Hebei, and Shandong Provinces Project Function: Ultra-High-Voltage Direct Current (UHVDC) Power Transmission / Renewable Energy Transmission Infrastructure Project Type: ±800 kV UHVDC Transmission Project Transmission Line Length: Approximately 927 km Rated Voltage: ±800 kV Rated Transmission Capacity: 8 G Project Start: March 16, 2023 Commissioning Date: May 8, 2025

Shandong Haiyang Nuclear Power Plant Units 3 & 4 (Phase II)
Shandong Haiyang Nuclear Power Plant Units 3 & 4 Project

Location: Haiyang, Shandong Province, China Project Function: Nuclear Power Generation / Clean Energy Infrastructure Project Type: CAP1000 Nuclear Power Project Project Phase: Phase II of the Haiyang Nuclear Power Project Unit Capacity: 1.253 GW per unit Number of Units: 2 units — Units 3 & 4 Total Capacity: Approximately 2.506 GW Design Life: 60 years Construction Start: July 2022 Planned Full Operation: 2027

Fujian Zhangzhou Nuclear Power Plant Units 3 & 4 Project
Fujian Zhangzhou Nuclear Power Plant Units 3 & 4 Project

Location: Zhangzhou, Fujian Province, China Project Function: Nuclear Power Generation / Clean Energy Infrastructure Project Type: Hualong One (HPR1000) Nuclear Power Project Project Phase: Phase II of the Zhangzhou Nuclear Power Project Technology: Hualong One (HPR1000) Third-Generation Nuclear Power Technology Construction and Equipment Installation Unit Capacity: Million-kilowatt-class nuclear power units Project Status: Under Construction — Civil

Qingzhou 6 Offshore Wind Power Project
Qingzhou 6 Offshore Wind Power Project

Location: Offshore waters near Yangjiang, Guangdong Province, China Project Function: Offshore Wind Power Generation / Offshore Power Transmission Infrastructure Project Type: Offshore Wind Farm / 330 kV Offshore Booster Station Project Ownership: China Three Gorges Renewables (Yangjiang) Power Generation Co., Ltd. Planned Installed Capacity: Approximately 1,000 MW Booster Station Capacity: 1,000 MW / 330 kV Booster Station Weight: Approximately 6,800 tons Construction Start: August 2022

Scroll to Top